Friday, September 26, 2008
Hampton Loves....
Thursday, September 25, 2008
Politics are FUN!
www.tastebudpolitics.com
You can also find out your the type of mexican food you are....yummm...I'm a burrito :)
Tuesday, September 9, 2008
Progress....
Guest room. Todd replaced the windows and all of the trim and overlayed the old ceiling. Still need to finish plastering and add the crown molding
Saturday, September 6, 2008
Lots to Catch Up On!
On that same weekend we walked over to the New England Aquarium for Hampton's first visit.
Billy and Will Reilly
We walked over to the New England Aquarium for Hampton's first visit that same weekend. HH liked the Shahhhks!
On our walk home from the aquarium, we paused to take a photo of the new Rose Kennedy Park (part of the "Big Dig). It's amazing to think that only a few years ago this would have been a picture of Marin and Hampton underneath a overpassing highway (now the highway is running beneath Marin's feet!)
Hampton enjoyed the views of Falmouth's Inner Harbor as we shoved off for Edgartown.
While Hampton slept during last year's annual breakfast at "Among the Flowers", he was a bit more lively this year.
The Knight's and the Lewicki's having some appetizers on Labor Day weekend (steamers!)
Though not a fan of seafood, Aunt Lauren was just happy that there was plenty of wine.
Hampton loves the pool.
Hampton did NOT like getting his hair cut. He got over it though.
Sunday, August 17, 2008
Renovations: The Third Floor
For the past two years, the third floor has gone somewhat unused. It has three bedrooms, two of which are good size that we used as guest rooms and a smaller third bedroom that we use as an office. It also has a door at the back end of the hallway that goes out to a third floor deck.
Our plan is to make this floor into the kid(s) floor (no, she's not pregnant). The first problem with this floor was that there is great living space, but no bathroom. We tinkered with keeping the layout as is and cramming in a full bath somehwere, but it just didn't work well. We then decided, because we have two large bedrooms on the second floor, that we'd take the smaller office/bedroom and make it into a nice size bathroom. This way we're left with 4 good sized bedrooms and a nice bathroom for the kid(s).
Our contractor is Todd Slocum from The Solcum Group in Beverly, MA. He did some work on an old building across the street from us and I got to know him a bit while he was working. He has been great to work with on the project.


View into the new bathroom. To the left of that stud is where the old door/entrance to the office used to be and to the right of it is the new entrance into what will be the bathroom.
This is almost the same view, but moreso from the entry way. The bathroom will have a separate sink area (double vanity will go on the left in this picture) and then a doorway into the tub/toilet area (toilet is placed right where it will end up being, tub will be across from that). This way we figure we can have as many as three kids in the bathroom at once..two at the sink and one taking a shower or taking care of business!
This is where the double sink vanity will go.
This is a view from the toilet looking to where the tub will eventually go
Not sure why, but the last owner decided to cover the original hardwood floors with some really thin wood floors that we're not really fans of. We were happy to see what was beneath and plan to rip up all the floors to expose and refinish the original pine hardwoods. The bathroom will be tiled, however.
This will be Hampton's new room once it's done! They are going to replace all the walls and the ceiling and wood trim and add crown molding.
View from Hampton's bedroom door to the to-be bathroom door across the hall.
This is the room that I took about a month to refinish. They're just replacing the ceiling, the woodwork/trim and windows in this room.