Week 9

Well, according to our contractor, Todd, we're one week away and should be able to move in on Friday July 24. Right now there is a lot of little stuff being completed. Molding is being placed where it needs to be, the built in's are being rebuilt, the plumbing and electrical fixtures are being installed, etc. Our painters did start to prime certain areas and get things ready, so they should be done during week 10. Granite was installed in the kitchen. Floors will be done over the weekend of the 18th and 19th. Not much has changed in the bathroom. We are just waiting on some grout, paint and custome glass shower enclusure.




The fireplace was built. Todd did a great job with framing it out. The TV will go in the recessed box and the center spearker will go in that box just above the fireplace. The speakers on the cieling need to be re-centered.



Todd put crown molding everywhere there wasn't. Here it is in our master bedroom