Friday, June 19, 2009

Renovations Weeks 4 & 5

Week 4

This week was a productive week - the rough plumbing was completed, electrical work was etched out and (surprise), the kitchen floor was rebuilt. The rooms filled with debris from demo were cleared out so now we can "see" a bit more of the progress that was made. No pictures from this week as it just looks a bit cleaner than last weeks but we'll see a lot of progress in Week 5.

We're still surviving our nomad lifestyle. In fact, we've embraced it. Hampton now refers to Starbucks as the "muffin store". He also talks all about "Will's house". He's acclimated to the changes and we're having fun too.

Stay tuned for more updates next week!

Week 5

We've got walls. The blue board and plaster guys showed this week and got alll the blue board up and patched ready to be plastered. It's starting to come together...




They finally opened up the wall from the foyer into the family room. So this is what you see now when you walk into the house instead of the foyer being somewhat of a separate room.



A view from the front of the family room all the way to the back of the kitchen.


A view of the new kitchen space. They ripped out a full bathroom, a chimney, the back wall and the sub floor in this space.


Progress in the bathroom. The template for the tub deck is done, just waitng for installation.

Week 6 I will be handing of the project mgmt to Marin as I will be in Block Island for Block Island Race Week.

Sunday, June 7, 2009

Renovations: Week 3

A dissapointing week on the renovation front. The electricians showed up on Monday and ran all the wires and Todd demo'd the wall covering the fireplace, though the bricks are still there that need to be removed. Other than that, nothing happened this week. The plumber was supposed to show up and do some work, but he only ended up meeting with Todd for an hour or so to go over the plans. I guess the good news is that the plumber felt that "there isn't much work to do here" and also saw no problem doing everything we had planned. That's good news as they are essentially redoing all of the plumbing for the house, venting and all.

Todd is also in the middle of a project renovating a gorgeous home on Monument Square, but he assured us that he would be at 5 Prescott full time from 6/8 onward. They goal is to have the rough inspection (framing, plumbing and electrical) signed off by the end of week 4.

We've got a lot of work to do and I will have to hand the reigns over to Marin in a couple of weeks as I am taking off for Block Island Race Week June 20 - 27th.

No pics this week. Not worth the effort. Hopefully next week's pictures will show a significant change

Sunday, May 31, 2009

Weekends on the Cape


During the renovations, we have been spending the weekdays at the Reilly's in Norwell and the weekends on the Cape. Saturday evening we headed to Hyannisport for dinner and Hampton had a blast running around on the 18th and practice greens. He already enjoys knocking the golf ball around with his toy clubs. Nothing wrong with getting him started early!


Friday, May 29, 2009

Renovations: Week 2

No major set backs this week. The dumpster didn't show up on Tuesday as planned, but otherwise the guys made a lot of progress for a short week.

We had to hire a crane to move the vanity from the first floor to the second. The staircase has a turn at the top that makes it impossible to move any large furniture upstairs. This is the fourth time we have had a crane move a piece of furniture through a second story window. Of course, this was the only time that things did not go smoothly. They damaged the copper flashing and decorative molding above our entry way and caused some minor damage to the vanity, but apparently their insurance company is going to take care of us.
As for progress...



The house is wide open from front to back. Todd's guys are standing in the kitchen about to knock out and frame in where a window used to be. The first floor has a lot of framing left. Most of this week's progress was made in the Master Bath on the second floor.

They have installed the pocket door. We used an original french door that was in our basement as the pocket door. It will slide behind the shower wall that is framed out in this picture.

Here is the tub frame for the drop in Airbath. The framed out piece on the far left of the deck is actually the bench that will be in the shower. The shower and the bath deck will overlap with a close enclosure

Just another shot from the Master Bedroom into the Master Bath. They have framed out where the glass block window will go in the back. Being in the city, our neighbors are literally RIGHT behind our house, so we went with an obscured glass block window to maintain privacy and let the light in.

Wednesday, May 20, 2009

Renovations: Phase 2, Week 1

When Marin and I bought 5 Prescott almost 3 years ago, we knew it would be a big undertaking to make it our own. We had a LOT of ideas, some of which we have found out are far too outlandish (or expensive) to incorporate, but most of which are now within our grasp.

Phase 1 of the renovations included getting the third floor all set for the kid(s). It was important for us to have everything in place for HH's arrival. We figured the house would be done floor by floor - 3rd floor down to the basement - in 4 phases. However, because the Master Bath is located directly over the Kitchen, tackling the first and second floor at the same time for Phase 2 made more sense. This would leave only the basement to finish!

The first floor renovation will include: a complete remodel of the kitchen (removing chimney, bathroom and ceiling soffit/framing new roof line off back of house); significantly widening the openings between the front foyer and the family room, the family room to the dining room and the dining room to the kitchen; a fireplace in the family room using an existing chimney/fireplace that has been covered up over the year; a bar area in an existing built-in in the dining room; entire first floor wired for ceiling speakers and surround sound in the family room; new floors throughout the first floor and new trim and crown molding throughout the first floor. Then, paint and decorate.

The second floor renovation will include: a complete remodel of a full bathroom with custom glass shower enclosure, airbath and marble tile; closing the hallway entrance into the new bathroom and making it a closet for the master bedroom; opening a doorway from the master bedroom into the new master bathroom; refinishing original hardwood floors; surround sound wired in the play room and new trim and crown molding throughout the second floor.

Day 1 of renovations was on May 18. Todd and his team showed up ripped up both the bathroom and the kitchen. They found that the back wall of the kitchen was in very bad shape and ripped it down completely to rebuild.
The first week was pretty much all demo...still more demo to go as well.

More to come.....


A view from our Kitchen doorway looking back. They had to rebuild the entire back wall. You can see the toilet where the bathroom used to be...no more bathroom in the kitchen (which is suprisingly sad since we can't cook and shower at the same time!)


Todd and his crew made quick work of the back wall. Still some more demo to be done.

This is just one of the walls that they are knocking down on the first floor. This wall separates the family room and dining room. To the left, there was a closet that they destroyed which is where our small half bath will end up going.



This is the master bath "to-be". You can see where the entrance used to be on the left - which would go into the master bedroom. We're going to block the current entrance on the right, make that hallway a closet for the master bedroom and re-open the original doorway that you see on the left.

I love this picture because it highlight's the beautiful blue tub and toilet we had.